- Auctions
- Direct Sales
- All categories
- Metal
- Wood
- Construction
- Sell
Help
Video 1 Video 2 |
Sorting line composed of:
TECHNICAL DATA
Inspection possible by appointment.
ATTENTION!
Disassembly and loading are the responsibility of the buyer. The maximum time available for disassembly and loading is 30 working days (6 weeks). At the end of the 30 days, a penalty of 15,000 euros will be applied, payable on the deadline indicated as the end of the work. If this amount is not settled within 4 working days, the remaining goods on-site will be considered the property of the seller, who will dispose of them, demanding reimbursement of the expenses incurred from the company that acquired the asset.